Bommer Plumbing — cinematic rebuild

16:9 · 37s · 1920×1080 · −14.2 LUFS · review only, nothing sent to the client
★ v2 — THE REBUILD (watch this)
wide establishing shot · scale changes on every cut · 2.6–8s shots · endcard 4s
v1 — the rejected one, for comparison
every shot a close-up, muted grade, 42s

WHAT CHANGED

v1 (rejected)v2 (this)
Openingclose-up of a sinkWIDE street, golden hour, sun through the trees
Scaleclose-up on all 4 shotswide / medium / low / close / macro / wide
Camera dialsintimate_observer + window + naturalistic (twice) epic_scale + contre_jour + teal_orange_epic, plus a speed ramp
Cut rhythm7–8s, flat2.6–8s, moves
Captionson every shottwo
Endcard6s4s

THE SHOTS

#ShotEngine + lookcr
1WIDE street, van arrivesCS 3.5 · epic_scale / contre_jour / teal_orange_epic25
2Sink overflows onto the counterCS 3.0 · speedramp20
3Boots and bag hit the drivewayKling 3.0 pro · 1080p7
4Cleanout cap comes offKling 3.0 pro · 1080p7
5Camera head descends into the pipeKling 3.0 pro · 1080p7
6Pipe POV → the rootsSeedance 2.0 std · high bitrate36
7Both of them at the monitorCS 3.5 · epic_scale / practicals30
8The vancertified still + push — never animated0
9Endcard, 4sthe approved card0

WHAT I CAUGHT AND FIXED BEFORE YOU SAW IT

CHECKS